AI-Augmented Project Portfolio Digital Twin for Dynamic Capacity, Dependency, and Risk Management: A Systematic Review
DOI:
https://doi.org/10.71238/snnst.v2i02.234Keywords:
Artificial Intelligence; Design Structure Matrix; Digital Twin; Organizational Digital Twin; Portfolio Risk Management; Project Interdependencies; Project Portfolio Management; Resource Capacity Planning; Resource-Constrained Project SchedulingAbstract
Project portfolios in engineering, construction and technology firms experience resource sharing, complex cross-project relations, and correlated risks, and even though they are managed by a shared resource pool, project decisions are primarily made based on those static, periodic reports. Based on the available peer-reviewed literature published from 2001 to 2024, this systematic review brings together six streams of literature: digital twin foundations, built-environment twins, organizational twins, portfolio and risk governance, artificial intelligence (AI) for project management, and planning and dependency modelling, to develop the conceptual and technical basis of an AI-augmented project portfolio digital twin. Sources were classified in terms of capacity, dependency functions and in terms of the integration of the digital model, digital shadow and digital twin. The synthesis reveals that despite being conceptually unified, classified implementations still remain dominated by digital shadows (35%) and digital models (28%). From the survey of 175 to 182 firms, portfolio research evidence is strong on the link between front-end quality and portfolio success, and strategic control and portfolio risk management. AI evidence is wide-ranging – one scientometric review includes 4,473 articles – and expert opinion highlights schedule, cost and risk management as knowledge areas that are most vulnerable to AI. Proposed a 5-layer reference architecture for the resource constraint scheduling, RSM propagation and AI forecasting in a closed loop, predict and decide loop. Some estimates suggest that ignoring the dependencies would result in approximately 55% underestimate in aggregate exposure and approximately 10 months in the completion time of the P80 exposure. The key issues to overcome are data integration, model fidelity, explainability, and the value for these stakeholders.
Downloads
References
F. Afzal, S. Yunfei, M. Nazir, and S. M. Bhatti, “A review of artificial intelligence based risk assessment methods for capturing complexity-risk interdependencies: Cost overrun in construction projects,” Int. J. Manag. Proj. Bus., vol. 14, no. 2, pp. 300–328, 2021, doi: 10.1108/IJMPB-02-2019-0047.
B. R. Barricelli, E. Casiraghi, and D. Fogli, “A survey on digital twin: Definitions, characteristics, applications, and design implications,” IEEE Access, vol. 7, pp. 167653–167671, 2019, doi: 10.1109/ACCESS.2019.2953499.
C. Boje, A. Guerriero, S. Kubicki, and Y. Rezgui, “Towards a semantic construction digital twin: Directions for future research,” Autom. Constr., vol. 114, no. 103179, 2020, doi: 10.1016/j.autcon.2020.103179.
T. R. Browning, “Applying the design structure matrix to system decomposition and integration problems: A review and new directions,” IEEE Trans. Eng. Manag., vol. 48, no. 3, pp. 292–306, 2001, doi: 10.1109/17.946528.
M. Caporuscio, F. Edrisi, M. Hallberg, A. Johannesson, C. Kopf, and D. Perez-Palacin, “Architectural concerns for digital twin of the organization,” in Software Architecture: ECSA 2020 (Lecture Notes in Computer Science, vol. 12292, 2020, pp. 265–280. doi: 10.1007/978-3-030-58923-3_18.
A. Fuller, Z. Fan, C. Day, and C. Barlow, “Digital twin: Enabling technologies, challenges and open research,” IEEE Access, vol. 8, pp. 108952–108971, 2020, doi: 10.1109/ACCESS.2020.2998358.
M. Grieves and J. Vickers, “Digital twin: Mitigating unpredictable, undesirable emergent behavior in complex systems,” in Transdisciplinary Perspectives on Complex Systems, 2017, pp. 85–113. doi: 10.1007/978-3-319-38756-7_4.
S. Hartmann and D. Briskorn, “A survey of variants and extensions of the resource-constrained project scheduling problem,” Eur. J. Oper. Res., vol. 207, no. 1, pp. 1–14, 2010, doi: 10.1016/j.ejor.2009.11.005.
D. Jones, C. Snider, A. Nassehi, J. Yon, and B. Hicks, “Characterising the digital twin: A systematic literature review,” CIRP J. Manuf. Sci. Technol., vol. 29, pp. 36–52, 2020, doi: 10.1016/j.cirpj.2020.02.002.
W. Kritzinger, M. Karner, G. Traar, J. Henjes, and W. Sihn, “Digital twin in manufacturing: A categorical literature review and classification,” IFAC-PapersOnLine, vol. 51, no. 11, pp. 1016–1022, 2018, doi: 10.1016/j.ifacol.2018.08.474.
M. Liu, S. Fang, H. Dong, and C. Xu, “Review of digital twin about concepts, technologies, and industrial applications,” J. Manuf. Syst., vol. 58, pp. 346–361, 2021, doi: 10.1016/j.jmsy.2020.06.017.
F. Tao, H. Zhang, A. Liu, and A. Y. C. Nee, “Digital twin in industry: State-of-the-art,” IEEE Trans. Ind. Informatics, vol. 15, no. 4, pp. 2405–2415, 2019, doi: 10.1109/TII.2018.2873186.
C. P. Killen and C. Kjaer, “Understanding project interdependencies: The role of visual representation, culture and process,” Int. J. Proj. Manag., vol. 30, no. 5, pp. 554–566, 2012, doi: 10.1016/j.ijproman.2012.01.018.
A. Kock, W. Heising, and H. G. Gemünden, “A contingency approach on the impact of front-end success on project portfolio success,” Proj. Manag. J., vol. 47, no. 2, pp. 115–129, 2016, doi: 10.1002/pmj.21575.
J. Kopmann, A. Kock, C. P. Killen, and H. G. Gemünden, “The role of project portfolio management in fostering both deliberate and emergent strategy,” Int. J. Proj. Manag., vol. 35, no. 4, pp. 557–570, 2017, doi: 10.1016/j.ijproman.2017.02.011.
Q. Lu, X. Xie, A. K. Parlikad, and J. M. Schooling, “Digital twin-enabled anomaly detection for built asset monitoring in operation and maintenance,” Autom. Constr., vol. 118, no. 103277, 2020, doi: 10.1016/j.autcon.2020.103277.
A. F. Carazo, T. Gómez, J. Molina, A. G. Hernández-Díaz, F. M. Guerrero, and R. Caballero, “Solving a comprehensive model for multiobjective project portfolio selection,” Comput. Oper. Res., vol. 37, no. 4, pp. 630–639, 2010, doi: 10.1016/j.cor.2009.06.012.
T. V Fridgeirsson, H. T. Ingason, H. I. Jonasson, and H. Jonsdottir, “An authoritative study on the near future effect of artificial intelligence on project management knowledge areas,” Sustainability, vol. 13, no. 4, 2021, doi: 10.3390/su13042345.
K. Lyytinen, B. Weber, M. C. Becker, and B. T. Pentland, “Digital twins of organization: Implications for organization design,” J. Organ. Des., vol. 13, no. 3, pp. 77–93, 2024, doi: 10.1007/s41469-023-00151-z.
M. Martinsuo, “Project portfolio management in practice and in context,” Int. J. Proj. Manag., vol. 31, no. 6, pp. 794–803, 2013, doi: 10.1016/j.ijproman.2012.10.013.
Y. Pan and L. Zhang, “Roles of artificial intelligence in construction engineering and management: A critical review and future trends,” Autom. Constr., vol. 122, no. 103517, 2021, doi: 10.1016/j.autcon.2020.103517.
R. Parmar, A. Leiponen, and L. D. W. Thomas, “Building an organizational digital twin,” Bus. Horiz., vol. 63, no. 6, pp. 725–736, 2020, doi: 10.1016/j.bushor.2020.08.001.
R. Pellerin and N. Perrier, “A review of methods, techniques and tools for project planning and control,” Int. J. Prod. Res., vol. 57, no. 7, pp. 2160–2178, 2019, doi: 10.1080/00207543.2018.1524168.
M. Wauters and M. Vanhoucke, “A comparative study of artificial intelligence methods for project duration forecasting,” Expert Syst. Appl., vol. 46, pp. 249–261, 2016, doi: 10.1016/j.eswa.2015.10.008.
A. Rasheed, O. San, and T. Kvamsdal, “Digital twin: Values, challenges and enablers from a modeling perspective,” IEEE Access, vol. 8, pp. 21980–22012, 2020, doi: 10.1109/ACCESS.2020.2970143.
R. Sacks, I. Brilakis, E. Pikas, H. S. Xie, and M. Girolami, “Construction with digital twin information systems,” Data-Centric Eng., vol. 1, 2020, doi: 10.1017/dce.2020.16.
I. Taboada, A. Daneshpajouh, N. Toledo, and T. de Vass, “Artificial intelligence enabled project management: A systematic literature review,” Appl. Sci., vol. 13, no. 8, 2023, doi: 10.3390/app13085014.
F. Tao, M. Zhang, Y. Liu, and A. Y. C. Nee, “Digital twin driven prognostics and health management for complex equipment,” CIRP Ann., vol. 67, no. 1, pp. 169–172, 2018, doi: 10.1016/j.cirp.2018.04.055.
J. Teller and A. Kock, “An empirical investigation on how portfolio risk management influences project portfolio success,” Int. J. Proj. Manag., vol. 31, no. 6, pp. 817–829, 2013, doi: 10.1016/j.ijproman.2012.11.012.
P. Willumsen, J. Oehmen, V. Stingl, and J. Geraldi, “Value creation through project risk management,” Int. J. Proj. Manag., vol. 37, no. 5, pp. 731–749, 2019, doi: 10.1016/j.ijproman.2019.01.007.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Yogesh Gawade (Author)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.